| Brownsville Hwy NE | Restricted | near | Central Kitsap Wastewater Treatment Plant | 4/1/2026 | 12/31/2029 | Construction | Short delays of less than 5 minutes | The Solids and Liquid Hauled Waste Upgrades project is a multi-year project to create long-term solids improvements and development of liquid hauled waste facilities at the Central Kitsap Wastewater Treatment Plant (CKTP) in Brownsville. Visit https://kcowa.us/cktp for more information. | Central |
| Chase Rd SE | Closed | at the intersection with | SE Lund Ave | 7/16/2026 | 10/31/2026 | Construction | Road closed - use detour or alternate routes | Road will be closed from 6am to 6pm, Mon-Fri. Closure in place to facilitate construction work on phase 2 of the Lund Corridor Improvements project. Visit http://kcowa.us/lund for project details. | South |
| Dickey Rd NW | Restricted | between | Hoot Ridge Ln NW and Dickey Pl NW | 8/4/2026 | 10/1/2026 | Other - Put details in the comments | Short delays of less than 5 minutes | NEELEY CONSTRUCTION COMPANY, contractor working in the area for road frontage improvements and utility installations for the Silverdale Recycling and Garbage Facility. Traffic control on site. | Central |
| Little Boston Rd NE | Restricted | near | Hood Canal Dr NE | 8/4/2026 | 8/31/2026 | Other - Put details in the comments | Short delays of less than 5 minutes | Pacific Civil and Infrastructure, private contractor on site, installing gravity sewer main, to include a crossing and asphalt restoration. Curb, gutter and sidewalk ramps at Hood Canal Dr intersection for work associated with private development. Traffic control in place. | North |
| NE Fruitland St | Restricted | between | Perry Ave and NE Helm St | 8/4/2026 | 8/31/2026 | Other - Put details in the comments | Short delays of less than 5 minutes | Project for North Perry Water to replace the existing aging water main along Fruitland Dr. due to recurrent water main ruptures. Work may expand into NE Helm St. Intermittent delays, traffic control is in place. | Central |
| NW Anderson Hill Rd | Restricted | between | Silverdale Way NW and Provost Rd NW/Old Frontier Rd | 8/3/2026 | 10/30/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | From Monday through Friday, with possible Saturday work, single-lane alternating traffic will be in place daily from 6 a.m. to 6 p.m. Portions of the roadway will have full closures overnight from 6 p.m. to 6 a.m. with detour routes signed. These traffic impacts are expected to continue through October 2026. Please note that this is not a Kitsap County Public Works project. Kitsap County Public Works is sharing this information as a courtesy so residents can plan ahead and avoid delays. Please allow extra travel time, consider alternate routes when possible, and follow all posted traffic control and flagger directions. For questions or comments please contact Project Manager Kim Rody: kim.rody@milesresources.com | Central |
| Perry Ave NE | Closed | between | NE Sheridan Rd and NE Stone Way | 6/8/2026 | 11/30/2026 | Construction | Road closed - Use detour or other alternate routes | Road will be closed to through traffic during construction work hours, Mon-Thur 7am to 6pm. Local access for residents, businesses, emergency services, school transportation, delivery service and garbage collection will be maintained. This work is related to the Perry Ave Non-Motorized Improvement Project. Project details at http://kcowa.us/perry | Central |
| SE Lund Avenue | Restricted | between | Harris Rd SE and Chase Rd SE | 5/18/2026 | 11/30/2026 | Construction | Moderate delays between 5 and 10 minutes | Two-way traffic on SE Lund Avenue will generally be maintained however motorists should expect intermittent lane closures, traffic delays, and reduced speeds through the work zone. This work is related to the SE Lund Corridor Improvement Project - Phase 1. More details at http://kcowa.us/lund | South |
| SE Mile Hill Dr | Restricted | at the intersection with | Fircrest Dr SE | 8/10/2026 | 9/30/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | Strickland and Sons Excavation LLC, private contractor on site doing frontage improvements and utility connections for a private development. Expect intermittent delays - traffic control in place. | South |
| SE Olympiad Dr | Closed | between | SE Southworth Dr and Inlet Ln SE | 2/2/2026 | 10/31/2026 | Construction | Road closed - Use detour or other alternate routes | Road closed to facilitate construction of Harper Estuary bridge. Detour routes will be posted. Visit http://kcowa.us/harper for project details | South |
| Stampede Blvd NW | Restricted | between | NW Durango Ct and NW Wrangler Ct | 8/4/2026 | 8/31/2026 | Other - Put details in the comments | Short delays of less than 5 minutes | OROZCO EXCAVATING INC. private contractor is in the area doing frontage improvements and utility connections for private development. Traffic control in place. | Central |