Brownsville Hwy NERestrictednear
Central Kitsap Wastewater Treatment Plant
4/1/202612/31/2029ConstructionShort delays of less than 5 minutes
The Solids and Liquid Hauled Waste Upgrades project is a multi-year project to create long-term solids improvements and development of liquid hauled waste facilities at the Central Kitsap Wastewater Treatment Plant (CKTP) in Brownsville. Visit https://kcowa.us/cktp for more information.
Central
Chase Rd SEClosedat the intersection with
SE Lund Ave
7/16/202610/31/2026ConstructionRoad closed - use detour or alternate routes
Road will be closed from 6am to 6pm, Mon-Fri. Closure in place to facilitate construction work on phase 2 of the Lund Corridor Improvements project. Visit http://kcowa.us/lund for project details.
South
Dickey Rd NWRestrictedbetween
Hoot Ridge Ln NW and Dickey Pl NW
8/4/202610/1/2026Other - Put details in the commentsShort delays of less than 5 minutes
NEELEY CONSTRUCTION COMPANY, contractor working in the area for road frontage improvements and utility installations for the Silverdale Recycling and Garbage Facility. Traffic control on site.
Central
Little Boston Rd NERestrictednear
Hood Canal Dr NE
8/4/20268/31/2026Other - Put details in the commentsShort delays of less than 5 minutes
Pacific Civil and Infrastructure, private contractor on site, installing gravity sewer main, to include a crossing and asphalt restoration. Curb, gutter and sidewalk ramps at Hood Canal Dr intersection for work associated with private development. Traffic control in place.
North
NE Fruitland StRestrictedbetween
Perry Ave and NE Helm St
8/4/20268/31/2026Other - Put details in the commentsShort delays of less than 5 minutes
Project for North Perry Water to replace the existing aging water main along Fruitland Dr. due to recurrent water main ruptures. Work may expand into NE Helm St. Intermittent delays, traffic control is in place.
Central
NW Anderson Hill RdRestrictedbetween
Silverdale Way NW and Provost Rd NW/Old Frontier Rd
8/3/202610/30/2026Other - Put details in the commentsModerate delays between 5 and 10 minutes
From Monday through Friday, with possible Saturday work, single-lane alternating traffic will be in place daily from 6 a.m. to 6 p.m. Portions of the roadway will have full closures overnight from 6 p.m. to 6 a.m. with detour routes signed. These traffic impacts are expected to continue through October 2026.

Please note that this is not a Kitsap County Public Works project. Kitsap County Public Works is sharing this information as a courtesy so residents can plan ahead and avoid delays.

Please allow extra travel time, consider alternate routes when possible, and follow all posted traffic control and flagger directions. For questions or comments please contact Project Manager Kim Rody: kim.rody@milesresources.com
Central
Perry Ave NEClosedbetween
NE Sheridan Rd and NE Stone Way
6/8/202611/30/2026ConstructionRoad closed - Use detour or other alternate routes
Road will be closed to through traffic during construction work hours, Mon-Thur 7am to 6pm. Local access for residents, businesses, emergency services, school transportation, delivery service and garbage collection will be maintained. This work is related to the Perry Ave Non-Motorized Improvement Project. Project details at http://kcowa.us/perry
Central
SE Lund AvenueRestrictedbetween
Harris Rd SE and Chase Rd SE
5/18/202611/30/2026ConstructionModerate delays between 5 and 10 minutes
Two-way traffic on SE Lund Avenue will generally be maintained however motorists should expect intermittent lane closures, traffic delays, and reduced speeds through the work zone. This work is related to the SE Lund Corridor Improvement Project - Phase 1. More details at http://kcowa.us/lund
South
SE Mile Hill DrRestrictedat the intersection with
Fircrest Dr SE
8/10/20269/30/2026Other - Put details in the commentsModerate delays between 5 and 10 minutes
Strickland and Sons Excavation LLC, private contractor on site doing frontage improvements and utility connections for a private development. Expect intermittent delays - traffic control in place.
South
SE Olympiad DrClosedbetween
SE Southworth Dr and Inlet Ln SE
2/2/202610/31/2026ConstructionRoad closed - Use detour or other alternate routes
Road closed to facilitate construction of Harper Estuary bridge. Detour routes will be posted. Visit http://kcowa.us/harper for project details
South
Stampede Blvd NWRestrictedbetween
NW Durango Ct and NW Wrangler Ct
8/4/20268/31/2026Other - Put details in the commentsShort delays of less than 5 minutes
OROZCO EXCAVATING INC. private contractor is in the area doing frontage improvements and utility connections for private development. Traffic control in place.