Point No Point Stormwater Study

​About the Project

Existing stormwater conditions in the Point No Point area have posed periodic challenges to residential areas, public infrastructure, habitat and water quality. Kitsap County Public Works Stormwater Division seeks to better understand how stormwater affects the Point No Point area. This study will help us understand current conditions and prepare for what we might face in the future as our climate changes and sea levels rise.

Using science-based methods and stakeholder input, we will perform hydraulic and hydraulic modeling. The analysis will evaluate stormwater needs both with and without a proposed estuary restoration project planned for the area. We will create computer models to see how water moves through the neighborhood under current conditions and under different future scenarios—both with and without restoration work. By understanding these patterns, we can identify potential stormwater management approaches—ones designed to be resilient as our climate shifts, land use changes, and natural areas are restored.

At the end of the study, we will have at least three conceptual stormwater management design alternatives for consideration. The findings from this study will inform discussions about stormwater management options in the Point No Point area. This will help us identify feasible, cost-effective solutions that reflect community input, environmental priorities, and future conditions.   


We want to hear from you

People who live and work in the Point No Point area bring essential knowledge about flooding, drainage, and local conditions. Your input will help shape the study and inform future solutions.

Timeline

This project will begin with data collection in the fall/winter of 2026. A final report is anticipated by the end of 2027.​
Community Engagement

We will engage with landowners, area Tribes, community stakeholders, and local county departments and agencies. There will be several community meetings held throughout the project duration. To keep informed of the process, we invite you to sign up​ to receive email updates. Select the 'KC Coastal Flooding' topic to be added to the email list.

This project has been funded wholly or in part by the United States Environmental Protection Agency under assistance agreement PC-01J95801-2 to the Washington State Department of Ecology. The contents of this document do not necessarily reflect the views and policies of the Environmental Protection Agency, nor does mention of trade names or commercial products constitute endorsement or recommendation for use.




Stay In Touch

​Sign up to receive email updates. 

Questions?
Contact 360.337.5777 or help@kitsap1.com

Point No Point Stormwater Study Public Meeting

Thank you for attending the June 2026 Public Meeting.​ The next meeting will be scheduled in early 2027. In the meantime, take a moment to share photos, videos, and observations of local stormwater conditions by clicking HERE!