| Brownsville Hwy NE | Restricted | near | Central Kitsap Wastewater Treatment Plant | 4/1/2026 | 12/31/2029 | Construction | Short delays of less than 5 minutes | The Solids and Liquid Hauled Waste Upgrades project is a multi-year project to create long-term solids improvements and development of liquid hauled waste facilities at the Central Kitsap Wastewater Treatment Plant (CKTP) in Brownsville. Visit https://kcowa.us/cktp for more information. | Central |
| Harris Rd SE | Closed | at the intersection with | SE Lund Ave | 7/7/2026 | 7/10/2026 | Construction | | Harris Rd SE will be closed approx 80 feet south of SE Lund Ave as crews work on stormwater crossings. Closure is 7am to 5pm | South |
| NE Fruitland Dr | Closed | between | From intersection of Perry Ave NE to the intersection with NE Helm Rd | 6/29/2026 | 7/31/2026 | Other - Put details in the comments | Road closed - Use detour or other alternate routes | North Perry Avenue Water District is updating infrastructure in your area to replace the existing water main. Please follow posted detours. The road closure will take place Monday through Thursday from 7:00am to 6:00pm as the weather permits. Work will be paused during inclement weather (heavy rain). Onsite crews will be ready to assist in directing traffic as needed. For local traffic access, plan for possible traffic delays and parking adjustments. Contact North Perry Avenue Water District at (360) 373-9508 or customerservice@northperrywd.org with any questions or concerns. | Central |
| NW Anderson Hill Rd | Restricted | between | NW Apex Airport Rd and 300 west of Olympic View Rd NW | 6/17/2026 | 8/14/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | PSE - in-ground line failures, infrastructure needs repair. Potelco will be trenching 3000 of underground power and add vaults. Traffic control on site with alternating lane with flaggers. Traffic delays could be more than 10 minutes some days. | Central |
| Parcells Rd NE | Restricted | between | State Hwy 104 to Rash Rd NE | 7/6/2026 | 7/10/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brush. Flaggers Present | North |
| Perry Ave NE | Closed | between | NE Sheridan Rd and NE Stone Way | 6/8/2026 | 11/30/2026 | Construction | Road closed - Use detour or other alternate routes | Road will be closed to through traffic during construction work hours, Mon-Thur 7am to 6pm. Local access for residents, businesses, emergency services, school transportation, delivery service and garbage collection will be maintained. This work is related to the Perry Ave Non-Motorized Improvement Project. Project details at http://kcowa.us/perry | Central |
| SE Lakeway Blvd | Restricted | between | Triviere Trail SE and Ridge Rim Trail SE | 7/9/2026 | 7/10/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brush, weather and resources dependent. Flaggers Present | South |
| SE Lund Avenue | Restricted | between | Harris Rd SE and Chase Rd SE | 5/18/2026 | 11/30/2026 | Construction | Moderate delays between 5 and 10 minutes | Two-way traffic on SE Lund Avenue will generally be maintained however motorists should expect intermittent lane closures, traffic delays, and reduced speeds through the work zone. This work is related to the SE Lund Corridor Improvement Project - Phase 1. More details at http://kcowa.us/lund | South |
| SE Olympiad Dr | Closed | between | SE Southworth Dr and Inlet Ln SE | 2/2/2026 | 10/31/2026 | Construction | Road closed - Use detour or other alternate routes | Road closed to facilitate construction of Harper Estuary bridge. Detour routes will be posted. Visit http://kcowa.us/harper for project details | South |
| Stampede Blvd NW | Restricted | between | Foxtail Pl NW and NW Wrangler Ct | 7/1/2026 | 7/31/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | Intermittent delays, traffic control on site. Private contractor, Orozco Excavating, onsite for utility installations and frontage improvements for new plat. | Central |